References

References

HEPP Installation / YAVUZ HEPP

PROJECT NAME : YAVUZ HEPP
POWER : 3* 7.5 MW (Orient Energy)
LOCATION : AMASYA
INVESTMENT PERIOD : 2008 - 2010
INVESTOR : HABBOUSH GROUP

OPERATIONS:
• SPIRAL CASE INSTALLATION & WELDING
• TURBINE & GENERATOR INSTALLATION
• ROTOR POLE COIL INSTALLATION
• LOW & MID CELL INTERIOR TRANSFORMER, DIZEL JENERATOR, MAIN POWER TRANSFORMER INSTALLATION LV-MV CUBICLES, AUXILIARY TRANSFORMER, DIESEL GENERATOR, MAIN POWER TRANSFORMERS INSTALLATION
• HIGH VOLTAGE TESTS
• LOW & HIGH VOLTAGE CABLING AND TERMINATION
• ALL ELECTRICAL RELATED SYSTEMS INSTALLATIONS

MASAT ENERGY / MIDILLI HEPP

PROJECT NAME : MIDILLI HEPP
POWER : 3* 10 + 1.5 MW (Orient Energy)
LOCATION : AMASYA
INVESTMENT PERIOD : 2011 – 2012
INVESTOR : HABBOUSH GROUP

OPERATIONS:
• MAIN BUILDING, REGULATOR, LOADING POOL GROUNDING OPERATONS
• SPIRAL CASE INSTALLATION & WELDING
• TURBINE & GENERATOR INSTALLATION
• AIR, OIL, COOLING WATER PIPING OPERATIONS
• ROTOR POLE COIL INSTALLATION
• LOW & MID CELL INTERIOR TRANSFORMER, DIZEL JENERATOR, MAIN POWER TRANSFORMER INSTALLATION LV-MV CUBICLES, AUXILIARY TRANSFORMER, DIESEL GENERATO MAIN POWER TRANSFORMERS INSTALLATION
• HIGH VOLTAGE TESTS
• LOW & HIGH VOLTAGE CABLING AND TERMINATION
• ALL ELECTRICAL RELATED SYSTEMS INSTALLATIONS

MASAT ENERGY / DOĞANKAYA HEPP

PROJECT NAME : DOĞANKAYA HEPP
POWER : 3* 6,5 MW (Orient Energy)
LOCATION : ADIYAMAN
INVESTMENT PERIOD : 2011 – 2012
INVESTOR : GÜLSAN GROUP

OPERATIONS:
• MAIN BUILDING, REGULATOR, LOADING POOL GROUNDING OPERATONS
• SPIRAL CASE INSTALLATION & WELDING
• TURBINE & GENERATOR INSTALLATION
• AIR, OIL, COOLING WATER PIPING OPERATIONS
• ROTOR POLE COIL INSTALLATION
• LOW & MID CELL INTERIOR TRANSFORMER, DIZEL JENERATOR, MAIN POWER TRANSFORMER INSTALLATION LV-MV CUBICLES, AUXILIARY TRANSFORMER, DIESEL GENERATO MAIN POWER TRANSFORMERS INSTALLATION
• HIGH VOLTAGE TESTS
• LOW & HIGH VOLTAGE CABLING AND TERMINATION
• ALL ELECTRICAL RELATED SYSTEMS INSTALLATIONS

SANKO ENERGY / TEPEKIŞLA HEPP

PROJECT NAME : TEPEKIŞLA HEPP
POWER : 2* 34 MW + 4 MW (ALSTOM)
LOCATION : TOKAT
INVESTMENT PERIOD : 2015
INVESTOR : SANKO HOLDING

OPERATIONS:
• LEICA LASER SYSTEM STATOR LAMINATION SHEETS INSTALLATION
• TURBINE & GENERATOR INSTALLATION
• COMPRESSED AIR, OIL, COOLING WATER PIPING OPERATIONS
• ROTOR POLE COIL INSTALLATION
• STATOR WINDING AND ALL INSTALLATION
• HIGH VOLTAGE TESTS
• LOW & HIGH VOLTAGE CABLING AND TERMINATION
• ALL ELECTRICAL RELATED SYSTEMS INSTALLATIONS

KEBAN HEPP: 8 * 202 MVA SİEMENS – AEG, KEBAN ELAZIĞ

KEBAN HEPP: 8 * 202 MVA SİEMENS – AEG, KEBAN ELAZIĞ
Service Period 1990 – 2006
Service provided to EÜAŞ
Rotor & top bridge disassembly&assembly, replacement of the older stators with new ones, start-up after drying.

KOVADA HES: 2 * 27 MVA, ISPARTA

KOVADA HES: 2 * 27 MVA, ISPARTA
Service Period 2003
Service provided to, DAMLAPINAR ENERGY/EÜAŞ .
manufacturing and installation of 288 ROEBEL Bar type generator stators & 10 Rotor Pole Coils, start-up after drying

IŞIKLAR HEPP: 2 * 650 VA, AKÇAABAT / TRABZON

IŞIKLAR HEPP: 2 * 650 VA, AKÇAABAT / TRABZON
Service Period 2006
Service provided to DEMİSTAŞ / EÜAŞ.
Renovation, disassembly &assembly of Stator & Rotor coils, start-up after drying

TUNÇBİLEK TERMİK SANTRALI: 3 * 150 MVA, KÜTAHYA

TUNÇBİLEK TERMİK SANTRALI: 3 * 150 MVA, KÜTAHYA
Service Period 1995
Service provided to EÜAŞ.
Change of 120 expansion joints

MET AŞ: Range 1.5 MVA – 15 MVA, KONYA – BARTIN – BOZÜYÜK

MET AŞ: Range 1.5 MVA – 15 MVA, KONYA – BARTIN – BOZÜYÜK
Service Period 1996 – 2007, MET AŞ / EÜAŞ
Renovation of stators & rotors of generators between 1.5 MVA to 15 MVA.

ALAÇATI RES: 12 * 600 KW, ALAÇATI / İZMİR

ALAÇATI RES: 12 * 600 KW, ALAÇATI / İZMİR
Service Period 2003– 2004, ARES GÜÇ BİRLİĞİ AŞ
Maintenance and test of 12 generators, renewal of coils of 12 generators.

SEYHAN HEPP: 27 MW, ADANA

SEYHAN HEPP: 27 MW, ADANA
Service Period 1998, Service provided to ÇUKUROVA ELEKTRİK
60 ROEBEL BAR Type Stator Coil Manufacturing, installation and start-up

OYMAPINAR HEPP: 4 * 135 MVA, ANTALYA

OYMAPINAR HEPP: 4 * 135 MVA, ANTALYA
Service period 2006
Service provided to CENGIZ HOLDING.
Stator coil drying, testing and start-up operations.

CINDERE HEPP: 3 * 10.5 MW, BULDAN / DENİZLİ

CINDERE HEPP: 3 * 10.5 MW, BULDAN / DENİZLİ
Service period 2008 – 2009
service provided to ENTEK ENERJİ
Spiral case montage & welding operations, turbine generator mechanical installation, rotor pole coil works, oil, water, cooling water piping.

ÇAMLICA HEPP: 3 * 30 MW, YAHYALI / KAYSERİ

ÇAMLICA HEPP: 3 * 30 MW, YAHYALI / KAYSERİ
Service period 2010
Service provided to AYEN ENERJİ
Generator rotor and top bridge disassembly and assembly, coil renewal, high voltage tests and start-up

BEYKÖY HEPP: 3 * 6.08 MW, GÖKÇEKAYA / ESKİŞEHİR

BEYKÖY HEPP: 3 * 6.08 MW, GÖKÇEKAYA / ESKİŞEHİR
Service period 2010
Service provided to ZORLU ENERJİ.
Generator rotor &upper bracket disassembly and assembly, Rotor & Stator renewal, high voltage tests and start-up.

ÇILDIR HEPP: 3 * 5.12 MW, ÇILDIR / KARS

ÇILDIR HEPP: 3 * 5.12 MW, ÇILDIR / KARS
Service period 2011
Service provided to ZORLU ENERJİ
Stator coil renewal, drying & start-up

ENGİL HEPP: 3 * 1.912 KW, ERCİŞ / VAN

ENGİL HEPP: 3 * 1.912 KW, ERCİŞ / VAN
Service period 2004
Service provided to EUAŞ
Generator coil changes, drying & start up, rotor pole coil changes

PAMİR 1-2: 46 MW, KHOROG / TACİKİSTAN

PAMİR 1-2: 46 MW, KHOROG / TACİKİSTAN
Service period 2010 – 2011
Service provided to PAMİR ENERGY
Adjustment wings, ÇARK, head cover, turbine shaft manufacturing, cooling water system renewal, white metal bearing installation, stator coil manufacturing, disassembly and assembly. Inlet valve rehabilitation, Pamir 2 white metal coil rehabilitation

ERENKOY NEHİR HEPP: 3 * 7.5 MW, Murgul / ARTVİN

ERENKOY NEHİR HEPP: 3 * 7.5 MW, Murgul / ARTVİN
Service period 2011
service provided toTURKERLER ENERJİ
Adjustment wings cavitations repairs, rotor cavitations repairs, turbine cover repairs, ring repairs

DOĞANKAYA HEPP: 3* 6.5 MW orient energy, ADIYAMAN

DOĞANKAYA HEPP: 3* 6.5 MW orient energy, ADIYAMAN
Service period 2011-2012
GÜLSAN GROUP
Spiral case assembly and welding, turbine-generator installation, oil, air and cooling water piping, rotor pole coil works, high voltage tests, low voltage and medium voltage cubicles, auxiliary transformer, diesel generator, main power transformer installation, low and high voltage cabling and termination, installation of all electrical systems

GÖKÇEKAYA HEPP: 3* 95 MW, GÖKŞEKAYA / ESKİŞEHİR

GÖKÇEKAYA HEPP: 3* 95 MW, GÖKŞEKAYA / ESKİŞEHİR
Service Period 1995 – 1996
Service provided toEÜAŞ
Cavitation and Rotor coil isolation operations

HOŞAP HEPP: 3.5 MW, VAN

HOŞAP HEPP: 3.5 MW, VAN
Service period 1990-2000
Service provided to EÜAŞ
Generator coil renewal, rotor pole coil renewal, white metal bearing molding

HİRFANLI HEPP: 40 MVAENGLISH ELECTRIC, KIRŞEHİR

HİRFANLI HEPP: 40 MVAENGLISH ELECTRIC, KIRŞEHİR
Service period 1980 – 1983
Service provided to EÜAŞ
Installation of locally manufactured turbine generator coil and Rotor pole coils

OYMAPINAR HEPP: 4 * 135 MVA, ANTALYA

OYMAPINAR HEPP: 4 * 135 MVA, ANTALYA
Service period 1988
Service provided to EÜAŞ
Disassembly and installation of rotor and upper bracket, change of older stator coil with locally manufactured parts, coils drying and start-up operations

SARIYAR HEPP: 4 * 40 MW, SARIYAR / NALLIHAN / ANKARA, 1979 – 1990, EÜAŞ

SARIYAR HEPP: 4 * 40 MW, SARIYAR / NALLIHAN / ANKARA, 1979 – 1990, EÜAŞ
Disassembly and installation of rotor and upper bracket, change of older stator coil with locally manufactured parts, coil drying and start-up operations

HOŞAP HEPP: 3.5 MW, VAN, 1975-1990, EÜAŞ

HOŞAP HEPP: 3.5 MW, VAN, 1975-1990, EÜAŞ
Renewal of generator coil, change of rotor pole coil, white metal bearing installations

Makelsan Electric-Energy with our expert staff with years of experience and as long;for a beautiful future, we're doing what we know best.